Graywind Smart Roman Shades Compatible with Alexa Google WiFi Hardwired Automatic Blinds with Remote Blackout Plain Fold Soft Roman Window Shades for Windows Doors, Custom Size (Flowline Midnight)
$313.50
Sale price
$313.50
Regular price
Shipping calculated at checkout.
About This
- Functional shades: 100% blackout fabric, classic plain fold roman shades with soft fabric, neat stack when raised. Roman window shades offers a classic and modern update to your home decor. Privacy & room darkening offered, ideal indoor window treatments for bedroom, living room, french doors etc. Rohs certificated and Eco-friendly.
- Direct to alexa/google: Hardwired motor and always plugged in, work with 2.4g/5ghz wifi. Easily achieve app control & voice control, no smart bridge required. Flexibly create groups or routines, set timing schedules and percentage control your smart blinds via mobile app or voice command, really free your hands! What's more, graywind automatic shades also can be controlled on app even you're away from home, no further worries.
- 15-channel timing remote: Able to seperately & group control maximum 15 smart curtains. It provides favorite position as well (the basic program of remote will be set before shipment). 20 date-time groups available, add any electric curtains to any schedules to achieve automatic timing control as preference. Support handheld or wall-mounted.
- Made to order: Click "customize now", custom dimensions and details. Please check amazon reconfirmation messages within 24 hours, order will proceed if we don't get reply in 48 hours.
- After service: Graywind smart blinds are designed for easier installation, manuals and video guide available. We provide long-term technical support.
Overview
- Material : 2 - Hardwired Smart Motor
- Product Dimensions : 120"L x 99"W
- Brand : Graywind
- Color : Blackout - Flowline Midnight
- Opacity : Blackout